Optimizing the Time Performance of Subcontractors in Building Projects

Construction Economics and Building

View Archive Info
 
 
Field Value
 
Title Optimizing the Time Performance of Subcontractors in Building Projects
 
Creator Ng, Andy K.W
Price, Andrew D.F
 
Subject
Subcontractor; Site coordination problem; Time performance

 
Description  The main contractors of Hong Kong building projects tend to subcontract most of their work. However, many of the subcontractors complain that they are not being fully utilized due main contractors’ poor site coordination of temporary works and interfacing works and plant supports etc. A list of critical site coordination problems caused by main contractors that had adversely influence to the time performance of subcontractors was prepared. A questionnaire survey was conducted to collect data to generate multiple regression equations that explain how the critical site coordination problems affected the time performance of different types of subcontractor. The survey results were validated by neural network analysis. Backward elimination method was adopted to identify the ‘most critical’ site coordination problems that enable main contractors to formulate measures to enhance their site management system.
 
Publisher UTS ePRESS
 
Contributor
 
Date 2010-07-02
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion


 
Format application/pdf
 
Identifier http://epress.lib.uts.edu.au/journals/index.php/AJCEB/article/view/1591
10.5130/AJCEB.v10i1-2.1591
 
Source Construction Economics and Building; Vol 10, No 1-2 (2010): AJCEB; 90 - 102
2204-9029
 
Language eng
 
Relation http://epress.lib.uts.edu.au/journals/index.php/AJCEB/article/view/1591/1736
 
Coverage South-East Asia


 
Rights Copyright (c) 2010 Andy K.W Ng, Andrew D.F Price
http://creativecommons.org/licenses/by/4.0