Record Details

Potential of Using Design-Build in Public Procurement

Applied Finance and Accounting

View Archive Info
 
 
Field Value
 
Title Potential of Using Design-Build in Public Procurement
 
Creator Blaťák, Ing. Jakub
 
Description Risk is an omnipresent effect in every area of human activity. Ignoring it can cause serious problems. This article is about eliminating risk in public contracts using the design-build method as a possible solution to reduce risk. First, we need to compare the standard method of design-bid-build with its alternative, design-build. Two methods are used in this article to analyse risk – the main method is RIPRAN. The evaluated results provided by the RIPRAN method are processed by research data using a scoring method with a risk map. The analysis is going to detect the difference between the DBB and DB methods, primarily in appearance and its impact on the realization of the whole construction.  The comparison identifies numerous contractual topics and risks included in both and gives deeper insight into risk management, both for the contracting party and also for public procurement. Applying risk analysis strategies and tools to the process will help decision-makers evaluate and select the most suitable delivery method consistently and defensibly. This paper gives generic risk factors related to both project types.
 
Publisher Redfame publishing
 
Contributor
 
Date 2016-07-01
 
Type info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Peer-reviewed Article
 
Format application/pdf
 
Identifier http://redfame.com/journal/index.php/afa/article/view/1708
10.11114/afa.v2i2.1708
 
Source Applied Finance and Accounting; Vol 2, No 2 (2016); 77-85
2374-2429
2374-2410
 
Language eng
 
Relation http://redfame.com/journal/index.php/afa/article/view/1708/1763